Main References

Maintenance & Services

Long Term Service Agreement (LTSA) including preventive and predictive maintenance, remote monitoring, spare parts, tools and field services

Solar® Turbines Taurus 60 Mobile Power Units

LTSA including engine overhauls, spare parts, training, control system upgrades, preventive maintenance and field services

  • Solar® Turbines fleet (Centaur, Taurus, Mars, Titan  30)
  • DR-990  gas turbines

LTSA including engine overhauls, spare parts and field services

Solar® Turbines fleet (Saturn 20, Centaur 40, Centaur 50, Titan130)

Maintenance contract including engine overhauls and field services

Solar® Turbines Centaur 40 compressor packages

Maintenance contract including preventive and predictive maintenance, remote monitoring, spare parts, training and field services

Solar® Turbines Titan 130 generator packages

Commissioning, troubleshouting and and field services

Solar® Turbines Taurus 60 compressor packages 

Maintenance contract of fire protection system

Fire & Gas detection system and fire extinguishing system of gas turbines pakcages

Maintenance contract including spare parts, overhauls and preventive maintenance

Solar® Turbines Centaur 50 generator packages

Commissioning and Troubleshooting

Turbomach® Titan 130 and Taurus 60 generator packages

Security & Safety - Building Technology

MV & LV distribution & protection lighting, lightning, LAN/Tel, fire detection, fire protection

EPC contract – Low Voltage
Electricity & Building Tech.

Replacement of fire detection systems and fire extinguishing systems

2 x  Turbopumps

Supply, installation and commissioning Fire Detection

Fire Detection system and associated services for fuel depot 

Supply, installation and commissioning Fire Detection

Extension of Fire Detection system

Upgrade of Supervision system MM8000® Maintenance and training

Fire Detection system

Supply, installation and commissioning Fire Detection

Extension of Fire Detection system

Engineering Procurement & Construction Projects

New power generation units 2x18MW

Supply, installation and commissioning of two power generation units (T250)

New power generation units 3x5MW Fast Track project

Supply, supervision of installation and commissioning of three mobile power units (T60)

New power generation unit 1x5MW Fast Track project

Supply, installation and commissioning of one mobile power unit (T60)

New power generation unit 1x10MW Fast Track project

Supply, installation and commissioning of one mobile power unit (T130)

Revamping of battery chargers and UPS

Engineering,  supply , installation and commissioning of new battery chargers and UPS

Air cooling system

Installation of 3 Evaporative Coolers with water treatment unit

Extension of power station

Supply, installation and commissioning of 1 x 3 MW power generation unit (C40)

Revamping of power station

Retrofit of of 3 x 3 MW power generation units and all BoP (fuel gas treatment unit, MV switchgear, LV swithgear, 24VDC and UPS system, F&G system, supervision system) with new control room

Extension of power station

Supply, supervision of installation and commissioning of 1 x 3 MW power generation unit (C40)

Revamping of compression station

Retrofit of exisiting compression station (6 Solar®
Turbines Centaur 40 gas compressors)

Power plant 3x3.3 MW - EPC contract with Turbomach®

Engineering, supply, installation and commissioning of all Balance of Plant (liquid fuel and gas fuel systems, MV&LV, water treatment, F&G detection and protection system,  security systems, data & communication system)  

Power plants - EPC contracts with Turbomach®

Engineering, supply, installation and commissioning of Balance of Plant (LV, F&G detection and protection system,  security systems, data & communication system)  

New power generation, fire detection, gas detection (CH4,H2S, SO2) ESD system ( SIL2), data & communication

Revalorization of Flared Gas – EPC Project

Technical Assistance and site supervision/commissioning

Co-generation 1×4.5 MW

New power generation unit, fire detection, gas detection (CH4,H2S, SO2) ESD system ( SIL2), data & communication and supervision

Revalorization of Flared Gas – EPC Project

Revamping of 5 power stations

Retrofit of 5 power stations (3 x Solar® Turbines S10 generators each)  

Revamping of power station

Retrofit of existing Power House (6 x 3 MW Solar®
Turbines C40 generators)

Revamping of power station

Retrofit of existing Power House (8 x 3 MW Solar®
Turbines C40 generators)